1.  Choose the proper size ball mill and hydrocyclone according to the ore charactor and the processing capacity.
  2.  Adopting the slurry pump with frequency conversion feature to feed the hydrocyclone for easy adjustment
  3.  Install Particle Sizing Systems to test the hydrocyclone overflow particle size easily
  4.  Make the feeder hopper, ball mill, slurry pump and hydrocyclone on the same steel structure foundation for easy and quick installation
  5. Choose the proper size of grinding ball according to the feeding size and discharging size